I'm currently running Vault 9.0 with Exchange 2010 SP2, and want to double-check my upgrade plan. The ultimate goal is to get from where I am today to 10.0.3. I'm on 32-bit hardware today, so it will require a hardware refresh.
High-level overview:
Upgrade from 9.0 > 9.0.4 Hotfix 3 in-place on existing hardware (includes running new SetEVThrottling.ps1 script, and manually replacing files as part of the 9.0.4 > Hotfix 3 process)
Outlook add-in (9.0.1) will stay the same at this point. Running Outlook 2010 across the board
Use the migration tool to go from 9.0.4 > 10.0.3 with a hardware migration included
Upgrade Outlook clients from 9.0.1 to 10.0.3 Outlook add-in
I'm obviously missing a lot of steps and details here, but I want to make sure the basics are correct. The upgrade from 9.0 > 9.0.4 looks fairly simple, and I did not encounter any noticable issues in the lab. 9 > 10 seems a bit more complex, and I have not started planning this piece of the upgrade yet, other than the high-level path mentioned above.
Any pointers or tips would be welcome.
Thanks!